Extensions



Stevenage, single storey extension and conservatory

Build completed May 2017

New kitchen extension, structural alterations and a conservatory.

We started this single storey extension in January.

Knebworth, two extensions and a garage conversion.

Build completed January 2017

We started both the front and back extensions in March 2016 and completed the extension and refurbishment throughout in 5 months.

This extension added a new family kitchen, utility, office, bedroom and a larger hallway.

Standon, single storey extension

Build completed June 2016

New kitchen extension, garage conversion and structural alterations

We started this traditional single storey extension in March 2016 and completed the extension in 11 weeks.

A 19m2 extension with vaulted ceilingand large velux windowswas added and the whole of the downstairs accommodation was opened up to create an open plan kitchen and living space.

The garage was partially converted into a study and a new corridor leading from the front door into the new kitchen area.

Digswell, Welwyn large extension.

Build completed 7th July 2015

We started this traditional build in April 2015 and completed the extension in 15 weeks.

A build this size always adds great space and value to any family home. This extension added a new family kitchen, utilty room, a larger dining room, 2 new double bedrooms with an en-suite to the master bedroom. See below for some of the pictures of this side and back extension.

Knebworth extension

Build completed in April 2015

This project is one of our favourites. This project was inspired by the architecture of a HUF HAUS. With the dramatic partnership of timber fascias and glass, this extension was built with its own distinctive character. The architect's details are available on request.

 

See more of this project 

Welwyn Garden City

Build completed in 2014

A unique build with a mansard roof to complement the existing architecture in a conservation area. The extension provided the family with an extra bedroom, bathroom, larger lounge and utility room.

Bengeo, Hertford

Build completed in 2013

This modern-looking extension was built using a steel frame to support the bi-folding doors and glass roof lanterns. The extension was built under the householder’s permitted development rights and created a contemporary kitchen living space.

Puckeridge extension

Build completed in 2011

A massive demolition and construction development project. The two-storey extensions, linked on the ground floor with a cat slip roof, created a new lounge, kitchen diner, utility room, two new bedrooms and three bathrooms.